Rio Grande Western, through its Tintic Range Railway subsidiary, completed its tracks to Eureka in early December 1891, then to Silver City in mid May 1892. Then in early July through mid September 1892, there were news stories about a completed survey west from Silver City to the Deep Creek mining district.
The grade for the planned extension was completed as far south as the old Tintic mills near today's McIntyre on the UP, as well in a couple strategic spots to occupy them before UP could. It all came to an end with the Silver Crash of late 1893.
The consolidation of D&RG interests in 1908 brought the Tintic Range Railway under direct management of the Denver & Rio Grande railroad in Colorado, and the Tintic Range became D&RG's Tintic Branch, and the remainder later became Union Pacific's Tintic Industrial Lead.
Tintic Branch Description
(View a map of the D&RGW Tintic Branch)
- Springville (MP 0.00) (yard)
- Spanish Fork (MP 3.8) (23 car side track)
- Payson (MP 10.8) (28 car side track)
- (UP Crossing -- MP 13.06; "Red Bridge")
- Santaquin (MP 15.4) (35 car side track)
- (Keigley -- MP 16.0; site of Staker limestone quarry)
- Townsend (MP 17.3) (13 car side track)
- Harold (MP 19.7)
- Goshen (MP 22.1) (21 car side track)
- Pearl (MP 27.5) (8 car side track)
- Wye track, connection with Goshen Valley Branch and Iron King Branch
- Hillside (MP 27.9) (16 car side track)
- Laguna (MP 30.8) (14 car side track)
- Cañon Siding (MP 34.9) (9 car side track)
- Knightsville (MP 27.5) (17 car side track)
- Wye track
- Eureka (MP 39.1) (yard)
- U. P. Crossing (MP 42.0)
- Silver City (MP 43.7, end)
Maximum grade: 3 percent (4 percent after 1940)
Maximum curvature: 12 degrees
Timeline
Rio Grande Western
May 11, 1891
Tintic Range Railway was incorporated by RGW interests to build from Spanish Fork or Provo, or some point between, to the Tintic Mining District. (Utah corporation index 910, 4354; Salt Lake Daily Tribune, May 12, 1891)
May 12, 1891
Articles of incorporation for Tintic Range Railway filed yesterday. (Salt Lake Daily Tribune, May 12, 1891)
August 7, 1891
RGW laying 58 pound steel rail on the Tintic branch. (Salt Lake Daily Tribune, August 7, 1891)
September 10, 1891
Tintic Range Railway completed to Payson. (Salt Lake Daily Tribune, September 11, 1891)
Being laid with 58-pound rail. (Salt Lake Daily Tribune, August 7, 1891)
(Wilson, p. 97, says that the Tintic Range Railway was completed from Springville to Eureka in 1891.)
(LeMassena, p. 92, says Tintic Range Railway built from Springville to Eureka, as standard gauge, in 1891.)
September 11, 1891
Tintic Range Railway completed to Payson yesterday. (Salt Lake Daily Tribune, September 11, 1891)
November 26, 1891
Item referring to the loop west of Goshen as being more scenic than Marshall Pass; also, proposed new timetable as of January 1, 1892 to show service to Tintic district and Eureka. (Salt Lake Daily Tribune, November 26, 1891)
December 1891
Tintic Branch was four miles from Eureka, with the tunnel at Homanville not yet completed, and graders at work beyond Eureka, to Mammoth and Silver City. (Salt Lake Daily Tribune, December 2, 1891)
December 2, 1891
Letter from Eureka says track is four miles from town; still at work on a tunnel in Homanville canyon; and grading beyond Eureka to Mammoth and Silver City is in progress. (Salt Lake Daily Tribune, December 2, 1891)
December 5, 1891
"Trains will be running into Eureka regularly by December 5 and arrangements are being made to run a through train from Ogden to this place leaving Ogden in time to reach here by evening staying overnight and departing in the morning to reach Salt Lake City by 9 a.m. and Ogden by 10 a.m." (Salt Lake Herald, December 1, 1891)
December 7, 1891
"Chair car 300 of the RGW is being placed on standard gauge trucks for service on the Tintic Branch." (Salt Lake Daily Tribune, December 7, 1891)
December 19, 1891
"The Tintic Range railway is completed to this point and the cars are running into Eureka but no regular passenger service has been established yet." (Salt Lake Herald, December 19, 1891)
December 23, 1891
The old 'Spanish Fork' station, on the RGW, is now 'Vista'; the new 'Spanish Fork' station is on the Tintic Branch. (Salt Lake Daily Tribune, December 23, 1891)
December 31, 1891
The depot at Eureka has been built, and side tracks now being put in. (Salt Lake Daily Tribune, December 31, 1891)
1892
RGW completed a new two mile line between Eureka and Mammoth Junction to serve the new Mammoth Mill. The new line included an additional mile of joint (with OSL) trackage to reach the mill itself. (LeMassena, p. 101)
January 1, 1892
Rio Grande Western's new timetable went into effect at 12:01 a.m. There were no changes to the mainline trains. "The Tintic line is opened regularly for the first time." "Superintendent Welby of the Rio Grande Western issues today a circular announcing that the Tintic Range branch operated by the company is opened for business from Springville to Eureka, a distance of [39.7] miles. The stations and sidings are as follows: Spanish Fork, Payson, Santaquin, Goshen, Hillside, Laguna, [Canyon] Siding, Homanville Siding, Summit, Eureka." (Salt Lake Tribune, January 1, 1892)
March 10, 1892
"Railroad Rumbles." "Mr. J. H. Bennett is out over the line on a special, accompanied by Savage, the artist, who is photographing points of interest, specially making a photo of the double circle at Tintic, which is a great engineering feat, that eclipses the Georgetown loop of Colorado, thereby scoring another success for the Rio Grande Western." (Salt Lake Daily Herald, March 10, 1892)
(View the Savage photo as part of the C. R. Savage Collection at BYU)
April 29, 1892
The stockholders of Rio Grande Western voted to increase their stock by 25,000 shares to allow the purchase of all of the stocks and bonds of the Tintic Range Railway, recently completed to Silver City. This gave RGW complete control and ownership of the Tintic Range company. (Ogden Daily Standard, April 30, 1892)
May 21, 1892
Tintic Range Railway amended its articles of incorporation to add an additional route to Nevada, and to increase its number of shares to fund its expansion westward from its then-current western terminus at Mammoth Hollow. Two routes were proposed. First, a direct line to Deep Creek, or second, an easier route by way of Fish Springs, then to Deep Creek. (Salt Lake Herald, May 21, 1892)
"From Mammoth Hollow the road will run in a general westerly and northerly direction in the counties of Juab and Tooele to or near to Dugway pass in Tooele county. Thence northwesterly to or near Deep Creek in the Dutch Mountain mining district, either by a general northwesterly course or by running southwesterly to or near to Fish Springs mining district, and thence northwesterly to Deep Creek. Thence from Deep Creek southwesterly to the line of the state of Nevada, at a point within fifteen miles north of the intersection of the line between Juab and Tooele counties with said state line. In case the main line does not go by way of Fish Springs, the branch line will be built to the camp from or near Dugway pass. The total length of the main line from Springville to the Nevada line by way of Fish Springs is 225 miles and by the more direct route between Dugway pass and Deep Creek 212 miles."
(Read more about RGW's Nevada Extension in 1892)
May 22, 1892
"Trains will be running through to Silver City over the Rio Grande Western on Sunday." This was an extension of the Tintic Range Railway, completed to Eureka in early December 1891. (Salt Lake Times, May 20, 1892, "Sunday" was May 22, 1892)
LeMassena, in his book "Rio Grande To The Pacific," on page 101, says that RGW completed its line from Eureka to Mammoth Junction (2 miles) in 1892. Then in 1893 completed its line from Mammoth Junction to Silver City (2 miles), along with seven miles of yard trackage at Silver City, all to serve the new Tintic Standard Mill at Silver City.
(Timetables show that it was 2.3 miles from Eureka to Mammoth Junction [LA&SL Crossing], and 1.7 miles from Mammoth Junction to Silver City.)
August 28, 1892
"The Rio Grande Western grade has reached the Tintic mill, and the rails will soon be laid." (Salt Lake Herald, August 28, 1892)
Denver & Rio Grande
July 31, 1908
August 1, 1908
Denver & Rio Grande Railroad (Consolidated) was organized and incorporated. Rio Grande Western Railway was merged with Denver & Rio Grande Railroad, along with Carbon County Railway, Castle Valley Railway, Copper Belt Railroad, San Pete Valley Railway, Sevier Railway, Tintic Range Railway, Utah Central Railroad, and Utah Eastern Railway. (LeMassena, pp. 115, 117)
According to LeMassena, page 67, the mechanism used by both D&RG and by RGW to build branchlines was to encourage a group of individuals, or a particular shipper, to organize a new company to build a spur or branch, contracting the actual construction to the railroads' construction crews. The railroads would then refund all costs of construction to the organizing company or individuals in the form of haulage credits until the full cost was fully recovered. Formal ownership, deed and title would then pass to the railroads.
March 1, 1929
D&RGW received Utah Public Utilities Commission approval to discontinue train numbers 409 and 410 between Springville and Silver City, over the Tintic Branch. (Utah Public Service Commission case 1071)
September 6, 1940
Union Pacific, LA&SL, and D&RGW received federal ICC approval for UP to access the Spanish Fork sugar factory of the Utah-Idaho-Sugar company. The ICC approved an agreement dated October 11, 1939 and signed by the railroads and the sugar company, and would allow Union Pacific trackage rights over the following: (1) after leaving its own Provo Subdivision mainline, approximately 1.038 miles over the sugar company's private Lake Shore Spur to its connection and crossing of the D&RGW Tintic Branch; (2) approximately 0.345 mile over the D&RGW Tintic Branch; (3) approximately 1.593 miles of D&RGW sidings and spurs from its Tintic Branch to the sugar factory, including an additional 0.505 mile over the Salt Lake & Utah spur that served the sugar factory. D&RGW and Salt Lake & Utah had jointly served the sugar factory under an agreement signed on October 1, 1918. Construction was to begin by November 1, 1940, and be completed by March 1, 1941. But research suggests the connection between UP and D&RGW, by way of the private Utah-Idaho Lake Shore Spur was never completed. (242 ICC 55; ICC Finance Docket 12812, decided September 6, 1940)
October 29, 1940
D&RGW received Utah Public Utilities Commission approval to close agency station at Goshen, on the Tintic Branch. (Utah Public Service Commission case 2425)
1941
Rio Grande's "Double Circle" loop in Pinion Canyon was constructed along with the rest of D&RGW's Tintic Branch in 1892. In early 1940, the trestle by which the line crossed over itself, was due for some major maintenance and upgrades to allow larger locomotives. Quoting from Richard Kindig's article in the December 1941 issue of Trains magazine:
Perhaps one of the most interesting railroad features in this almost treeless country is the loop of the D&RGW east of Eureka. The railroad ascends from the ancient bed of Lake Bonneville (a flat valley called Goshen), and turns into a narrow canyon after a short hair-pin curve in a tunnel. Not far from the mouth of the dry stream bed a complete corkscrew loop is made to the right, up and over the main. Here a trestle 80 feet high spans highway, wash, old line and a new line just completed. The new line, however, will spell the death of the loop, for it replaces a section of 3 per cent track including the trestle with new, more direct 4 per cent trackage.
This might seem unusual, since most relocations are made with easier gradients, but the maintenance of the aging trestle was an expensive item, and the structure was able to support only the D&RGW's Class 3300 locomotives, which the company felt had done their life's work. The new line, although steeper, will pass almost any kind of engine used on branch line service, and will shorten the length of rail and roadbed as well. It would have cost $120,000 to rebuild the trestle as against the $22,000 for the new line. The engines scheduled for operation are the 3400 class Mallets, newer than the 3300's. Since the upgrade movement is toward the mines, most of the cars will be empty over the 4 per cent section.
D&RGW chose to rebuild the portion of its Tintic Branch in Pinion Canyon, removing the loop trestle and bridge entirely. The new line increased the climb in the canyon from an already steep 3 percent, to a steeper 4 percent. Motive power for the branch was changed from the previous 2-8-0 locomotives then in service, to more powerful articulated 2-6-6-0 motive power in the 3400 series.
1943
D&RGW's Tintic Branch was cut back from Silver City to Eureka in 1943.
November 4, 1943
Eureka to Silver City Abandoned -- "F. D. No. 14342, Denver & Rio Grande Western Railroad Company Trustees Abandonment. Decided November 4, 1943. Certificate issued permitting abandonment by Wilson McCarthy and Henry Swan, trustees of the Denver & Rio Grande Western Railroad Company, of a portion of a branch line of railroad extending from Eureka to the end of the track at Silver City, approximately 3.49 miles; and abandonment of operation by them of another line of railroad extending from a connection with the branch near Mammoth Junction to the end of the track, approximately 0.85 mile, all in the State of Utah. T. R. Woodrow for applicant." (ICC Financial Docket 14342, in 254 ICC 831, "Cases Disposed Of Without Printed Report")
September 1961
The agent was removed from the Eureka depot in September 1961, but the agency had been closed by special permission since January 1961, after the last shipping mine was closed in December 1960. Although other mines may have begun shipping ore at some later time, the 1961 application showed that the last train operated out of Eureka on December 29, 1960.
1966-1967
At some time between May 1966 and June 1967, the time period between D&RGW Utah Division timetables No. 6 and No. 7, Rio Grande's Tintic Branch was changed from ending at Eureka, to end at the Iron King mine on the former Goshen Valley Railroad. The Goshen Valley Branch had originally consisted of two lines; one from its connection to the Tintic Branch at Pearl Junction to the Iron King mine, and another from Dividend Junction on the line to Iron King, to the Dividend mine.
This change in 1966-1967 eliminated the line to Dividend (the Dividend mine had closed in 1949), and changed the Tintic Branch to end at the Iron King mine (new mile post 33.8), instead of extending all the way to Eureka (old mile post 39.1). The end of track was at Kennecott's Burgin mine.
August 1972
The federal Interstate Commerce Commission approved D&RGW's request to abandon the Tintic Branch from Pearl Junction to Eureka, 13.13 miles, along with the Goshen Valley Branch from Flora to Dividend, 2.70 miles. (Railroad magazine, December 1972, page 66)
1980
A large potential shipper was established in about 1980 at Elberta on D&RGW's Tintic Branch, with the opening of a large grain storage facility. Built and owned by Elberta Utah Grain Storage, a unit of the LDS Church, the facility has sixteen concrete bins that hold up to 93,250 bushels each. Hard red wheat is stored on a four-year rotation, depleting and replenishing 25 percent each year. Corn is stored for one year or less. The facility remains in place as of May 2015, but without rail service.
1986
The last train to the Burgin mine was in 1986 when D&RGW ran a box car of equipment to the mine. Train 664 with two GP30s ran the entire 32.5 mile distance from Springville up the branch to the Burgin mine. The crew waited for it to be unloaded and returned. Conductor Neal Thorpe passed this news on to James Belmont during an interview in 1992. (James Belmont, email dated December 10, 2011)
After 1986, D&RGW (and later Union Pacific) only operated trains as far as the limestone quarry at Keigley (mile post 16.0), until Geneva Steel closed in 2001, taking away the need for limestone. Occasional traffic is still generated by the LDS Church's grain elevator at Elberta, at mile post 25.1.
Late 1987
In the late 1987 time frame, D&RGW continued to provide service along its Tintic Branch, using Train 665 to designate the train itself. The dolomite mine at Keigley was dormant after U.S. Steel's closing of its Geneva Works, but would soon reopen to supply material after the steel mill reopened under new management.
1991
Nine miles of the former D&RGW Tintic Branch, between Keigley and Elberta, were rehabilitated to accept inbound shipments of pipe for the Kern River pipeline. The pipe was stockpiled at Elberta. (James Belmont, Rails Through The Wasatch group on Facebook, November 29, 2015)
September 1998
Union Pacific continued to serve the limestone quarry at Keigley as late as September 1998, with service continuing until the closure of the Geneva steel mill in 2001.
February 2002
The last train operated on the branch in February 2002. (James Belmont, Rails Through The Wasatch group on Facebook, November 29, 2015)
May 2002
As part of a larger purchase of 62.77 miles of Union Pacific trackage in Utah, the 13 miles of the Tintic Industrial Lead (D&RGW's Tintic Branch, also known as The Elberta Line) was sold to Utah Transit Authority for future light rail construction. UP retained surface operation rights to continue common carrier service.
UTA bought the 13 miles of line from Springville to a point west of Payson and the bridge over the UP tracks in May 2002. The line west of the bridge (mile post 13.06) to Elberta was what UP formally abandoned in January 2008, along with its common carrier rights on the UTA portion.
UTA purchased the Tintic Industrial Lead in September 2002, from MP 0 to MP 13.06 (Payson). UP continued to operate to Elberta, at MP 26, a bit beyond Elberta to provide car storage for the Deseret Grain Storage. UP ended rail service in 2002, but compensated Deseret Grain for its use of trucks after UP ended service.
December 2005
Deseret Grain informed Union Pacific that they were about to start a dairy operation at Elberta, and wanted UP to restart rail service. Deseret projected 300 carloads of grain through 2007. UP declined to provide rail service on the grounds it was not profitable.
November 2006
UP applied to abandon rail service west of the UTA end of track at Payson, and STB approved the application in January 2008. With the formal abandonment, UP was no longer obligated to compensate Deseret Grain for its use of trucks. UP agreed to leave the rail in place, in case someone else wanted to operate the line.
January 2, 2008
The federal Surface Transportation Board approved Union Pacific's application to abandon railroad operations on what the railroad called its "Tintic Industrial Lead." Union Pacific had submitted its application on September 14, 2007, as successor to D&RGW. (Surface Transportation Board, Docket No. AB-33, Sub No. 209)
As late as February 2009, the line was still being used to store surplus rail cars.
March 2009
Tintic Southern Railroad, as a subsidiary of Ophir Mineral and Aggregate Group, usually known as Omag, began planning for a new railroad that would operate the former D&RGW Tintic Branch. Omag was already shipping limestone and other minerals from the quarry at Keigley, but was using trucks. Omag planned on rebuilding and renovating the tracks all the way west to the Burgin and Trixie mines on the east slope of the Tintic mining district. Omag began working with Utah Transit Authority, which owned the tracks as far as Payson, as well as with Union Pacific, which owned the tracks west of Payson, all the way to the Burgin and Trixie mines.
Tintic Southern Railroad (2009-2015)
(Read more about the failed Tintic Southern Railroad, actively planned from 2009 to 2015)
After 2015
May 2015
Portions of the western end of Tintic Branch, where the spurs crossed U.S. Highway 6 on the western edge of Goshen Valley, were destroyed by contractors working for the federal Bureau of Land Management, in a project to remove unwanted plant species. The work is known as "chaining" and involves a large chain connected between two bulldozers as they move across the land being "restored." The chain rips out native juniper trees and shallow-rooted plants, such as sage brush, for the purposes of encouraging the growth of grasses for the benefit of cattle grazing.
Chaining also destroys abandoned railroad tracks, in this case, the unused parts of the Tintic Branch. The rail, ties and track structure were ripped up without any care or concern, causing millions of dollars in damage and preventing any future use of the tracks.
During May 2015, UTA people were seen inspecting the line near the LDS elevator at Elberta. Specifically, they were looking at the rail for possible reuse elsewhere on the UTA system. The UTA has their 2040 plan that implies a Front Runner line all the way to Elberta.
November 2015
A large portion of the Tintic Branch was dismantled west of Keigley. The potential still exists for rail service to Keigley, over UTA-owned track from Springville to Payson, then over UP-owned track to Keigley. (Information and photos from Pete Maxfield, courtesy of James Belmont, by way of postings to Facebook "Rails Through The Wasatch" group, January 6, 2016.)
February 2016
Indictments for fraud were issued for the principle owner of the proposed Tintic Southern rail line, and an associated proposed industrial development at Elberta.
May 2016
Union Pacific discovered that seven miles of its (abandoned) Tintic Industrial Lead that had been removed. The removed track was valued at $175,000. Charges of theft and trespass were filed against the owner of the proposed Tintic Southern Railroad.
Newspaper articles:
- Deseret News - February 22, 2016
- Deseret News - June 2, 2016
- Deseret News - August 18, 2016
- Deseret News - August 31, 2016
- Deseret News - October 18, 2016
- Deseret News - November 28, 2016
Maps
Map of the Salt Lake & Western Ry. -- Later known as the Union Pacific's Fairfield Branch
Map of UP's Tintic area branches -- A Google map of UP's Tintic area branches
Map of D&RGW's Tintic branches -- A Google map of Rio Grande's Tintic branches, including the Dividend and Iron King Spurs, also known as the Burgin Mine Spur